Rubber Preformer 250

Product Details
Customization: Available
Certification: CE, ISO
Condition: New

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
5
Year of Establishment
2013-03-13
  • Rubber Preformer 250
  • Rubber Preformer 250
  • Rubber Preformer 250
  • Rubber Preformer 250
  • Rubber Preformer 250
  • Rubber Preformer 250
Find Similar Products

Basic Info.

Customized
Customized
Automatic Grade
Automatic
Structure
Horizontal
Transport Package
Wooden Case
Specification
SK-250
Trademark
SEA KING
Origin
Qingdao
HS Code
84778000
Production Capacity
10000/Sets

Product Description

Rubber Preformer



 
Machine Model JYZ-200 JYZ-250
Electrical Control system PLC PLC
Touch screen INCLUDED INCLUDED
Warranty 3YEARS 3 YEARS
Barrel Inside Diameter/mm 200 250
Total Power/kw 16 19/22
Hydraulic Pump Motor/kw 7.5 7.5/11
Cutting Machine/kw 1.5 1.5
Vacuum Motor/kw 0.75 0.75
Power for Heating/kw 5 8
Motor of Hot Water Pump/kw 0.09 0.09
Conveyer Belt Motor/kw 0.18 0.18
Compressed Air Pressure/MPa 0.55 0.55
Max.Compound Extrusion  Pressure/MPa 20.7 17.0
Maximum Barrel Temperature/ 95 95
Maximum Die Diameter/mm 125 190
Weight limit of Rubber Blank/g 0.3--200 0.3--2000
Weight Accuracy of Product/% ±1 ±1
Maximum Barrel Capacity(SG=1)/Kg 20-25 60-70
Cutter Speed (r/min) 35-300
infinite speed 
regulation
23-300
infinite speed 
regulation
External Dimensions (L*W*H)
(Meter)
3.6*1.1*1.6 5*1.1*1.6
Machine Weight(Ton) 3 4
 
Price Term 1. To be paid by T/T 30% of total amount in advance.
2. To be paid the balance by T/T 7 days before shipment.
Package and Transport Package way: nude packing & Electricity box wooden splints packaging
Transportation way: by sea
Inspection & test run When the order is finished, the seller will invite the buyer to come to seller factory for inspection & test run the machine line. After pass through and get the acceptance from buyer, then to accept a free training.
Supply, Installation and Adjustment time
 
Manufacture time: within 60 working days
Transportation time:According to buyer received Port.
Installation & adjustment time: within 7 days
The seller provide one technician for supervision to installment the machine at buyer plant for within 7 days, visa round trip and tickets, hotel cost, food are buyer cost, one technician US$100/DAY as allowance.
Warranty 36months since working in the buyers' factory.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier